Ze'Manage turns your BIM data into early warnings, so your team catches model risk before it compounds, not after it costs you a week. Preventive intelligence built into Revit, with a live web dashboard, project analytics and exportable reports for every level of your organization.

Ze

Manage

Looks manageable.

Moved element12
Broken links4
Unsynced models3
Oversized family files7

Where BIM projects quietly lose time

PROJECTSUBMISSIONS
Inside the modelstill cheap to fix
In coordinationgetting expensive
On sitefull price

Inside the modelstill cheap to fix

0+

warnings silently piling up in a typical mid-project Revit model as you read this.

Revit performance research, 2025
0 hrs

every week your BIM managers spend fighting model issues, not designing.

AEC coordinator workload studies, 2025

In coordinationgetting expensive

0%

of your coordination conflicts, the most expensive ones to fix on site.

Optimar / Scientific Reports, 2026
2 - 4 wks

typical schedule slip on a mid-size project from late-stage Revit rework.

Construction Industry Institute (CII)

On sitefull price

$0

average cost when a single MEP issue is found on site instead of in the model.

MEP BIM industry analysis, 2025
0%

of project cost lost to rework when coordination issues escape the model.

ACS / industry estimates, 2025
1,000+

warnings silently piling up in a typical mid-project Revit model as you read this.

Revit performance research, 2025
Inside the modelstill cheap to fix
27 hrs

every week your BIM managers spend fighting model issues, not designing.

AEC coordinator workload studies, 2025
60%

of your coordination conflicts, the most expensive ones to fix on site.

Optimar / Scientific Reports, 2026
In coordinationgetting expensive
2 - 4 wks

typical schedule slip on a mid-size project from late-stage Revit rework.

Construction Industry Institute (CII)
$25,000

average cost when a single MEP issue is found on site instead of in the model.

MEP BIM industry analysis, 2025
On sitefull price
30%

of project cost lost to rework when coordination issues escape the model.

ACS / industry estimates, 2025

Understanding the root causes and resolving by precautionary actions.

Why Ze'Manage

Preventive Intelligence for BIM teams.

A workflow platform that turns project data into early warnings. so BIM Managers and Project

Directors design preventively. Not reactively.

Issue caught early
See risk before it costs you

Live analytics across every project - model health, version drift, user activity - so coordination issues surface at design stage, not a handover.

Govern before drift becomes damage

Pin protection, command rules, and OTP gates stop the silent edits that turn into rework. Prevention happens automatically, inside Revit.

GOVERNED AUTOMATICALLY
Pin protection
Command rules
OTP gate
Inside Revit — no manual review needed
Roles stay defined
Director
BIM Manager
Workspace
Structure your team before chaos sets in

Three-tier roles and project workspaces give Project Directors clear ownership and BIM Managers clean handoffs - before delivery pressure rewrites who does what.

One Platform
Built for your Engineering Teams
01
Digital Engineering Lead / Director
Risk visible before it slips the schedule.
02
BIM / VDC Manager
Catch drift before it costs you.
03
BIM Modeler / Engineer
Less guessing. More context.
Portfolio Health & BEP Compliance
Full Audit Trail
Digital Engineering Lead / Director
Portfolio Health & BEP Compliance
Predictable delivery and margins, every project against your BIM Execution Plan
Full Audit Trail
Governance that actually runs, full record when stakeholders ask why
Leadership & Client Reports
Customized reports for leadership, audits & client handover, generated in one click
One Platform
Built for your Engineering Teams
01
Digital Engineering Lead / Director
Risk visible before it slips the schedule.
02
BIM / VDC Manager
Catch drift before it costs you.
03
BIM Modeler / Engineer
Less guessing. More context.
Portfolio Health & BEP Compliance
Full Audit Trail
Digital Engineering Lead / Director
Portfolio Health & BEP Compliance
Predictable delivery and margins, every project against your BIM Execution Plan
Full Audit Trail
Governance that actually runs, full record when stakeholders ask why
Leadership & Client Reports
Customized reports for leadership, audits & client handover, generated in one click

Sync Control

Automatically syncs models in the background, intelligently queues concurrent syncs, and records every sync event with a complete audit trail.

Auto Sync

Sync Queue

Full sync audit trail

01

/06

01

02

03

04

05

06

Ze'Manage ROI

Find out what poor BIM governance is costing you.

Two settings and you'll see the number. Most teams have never counted it — which is exactly why it keeps happening.

1

Tell us about your team

12people
$65per hour
12months
2

What it has already cost you

In the last 12 months, your team has lost

$39,000

to sync waits, manual model checks and late-stage rework — work you paid for that produced nothing.

That is 0.3 full-time modellers you already pay for who produce nothing.

What those months cost you$39,000
What Ze'Manage would have cost for the same months$2,880

You have already lost 14× what it would have cost to prevent it.

3

Where those hours actually go

Waiting on syncs22 hrs
Manual model checks11 hrs
Late-stage rework17 hrs
Every month50 hrs
4

What changes with Ze'Manage

Back in your pocket, monthly

$2,100

Over a year

$25,200

Pays for itself in

3 days

Ze'Manage costs $240 a month for your 12 people, and recovers about 72% of the waste above.

$0.00has gone while you've had this page open. about $20 every working hour your team models.
Show me how Ze'Manage stops this

Based on industry Revit team baselines and BIM governance benchmarks. Licence modelled at $20/user/month, recovery at 72% of identified waste. Estimates, not a quotation.

Two Interfaces.
One Platform.

Your team works inside Revit. You manage from the web. Every module your modelers touch reports to your dashboard the instant it happens - one connected platform, from the model to the boardroom.

01Inside RevitFor Modelers & BIM Managers
Revit logoAutodesk Revit — Ze'Manage tabAdd-in
Syncing
Protection
4 tools
Syncing
Activity Tracker
3 tools
Syncing
Health Monitor
2 tools
Syncing
Sync Control
2 tools
Syncing
Manage Projects
3 tools
Syncing
Add-ons & Ze AI
3 tools
02On the WebFor Managers & Directors
Zemanage.com/dashboardLive
Total Work
495hrs
Sync Time
15h 43m
Protected
3
Work Hours Trend
Recent Activity
Sync completed
MEC-MOD-2025 · 1w
Session opened
GF_S_028 · 1w
Ze'Manage · syncing live
RevitWeb
Command blocked
Protection · CAD import logged → Protected +1
now

Pricing

Spend less on oversight than a single billable hour.

All plans billed annually · 30-day guided trial on every plan · ZestineTech handles your onboarding

Standard

$18

/user/month

$15

Billed annually ·

Min. 10 users

For BIM teams who need accountability, protection, and AI assistance built into Revit.

What’s Included

Activity Tracker & Session Logs

Governance & Protection (Pin + Command + Event)

Ze AI - model-aware assistant

Add-ons (Batch NWC Export + Link Remapper)

4 guided onboarding sessions during trial

Role-based access (Company Admin, Project Admin, User)

Most Recommended

Pro

$25

/user/month

$20

Billed annually ·

Min. 10 users

For BIM Coordinators and VDC teams who need full model visibility - health monitoring, sync control, and everything in Standard.

What’s Included

Everything in Standard

Health Monitor - 30+ metrics, live dashboard, email alerts

Sync Control - Auto Sync (no lost work from missed syncs) + Sync Queue (no waiting when two users hit sync at once)

Role-based access (Company Admin, Project Admin, User)

4 guided onboarding sessions during trial

Enterprise

Custom

Billed annually ·

Min. 100 users

For large AEC firms and multi-project portfolios that need dedicated support, custom licensing, and firm-wide deployment.

What’s Included

Everything in Standard + Pro

Dedicated account manager

Volume licensing (multi-office, multi-region, flexible seat structures)

Custom onboarding for large teams

Priority SLA and direct support channel

Swipe to see all plans →
  • Standard

    $18

    /user/month

    $15

    Billed annually ·

    Min. 10 users

    For BIM teams who need accountability, protection, and AI assistance built into Revit.

    What’s Included

    Activity Tracker & Session Logs

    Governance & Protection (Pin + Command + Event)

    Ze AI - model-aware assistant

    Add-ons (Batch NWC Export + Link Remapper)

    4 guided onboarding sessions during trial

    Role-based access (Company Admin, Project Admin, User)

  • Most Recommended

    Pro

    $25

    /user/month

    $20

    Billed annually ·

    Min. 10 users

    For BIM Coordinators and VDC teams who need full model visibility - health monitoring, sync control, and everything in Standard.

    What’s Included

    Everything in Standard

    Health Monitor - 30+ metrics, live dashboard, email alerts

    Sync Control - Auto Sync (no lost work from missed syncs) + Sync Queue (no waiting when two users hit sync at once)

    Role-based access (Company Admin, Project Admin, User)

    4 guided onboarding sessions during trial

  • Enterprise

    Custom

    Billed annually ·

    Min. 100 users

    For large AEC firms and multi-project portfolios that need dedicated support, custom licensing, and firm-wide deployment.

    What’s Included

    Everything in Standard + Pro

    Dedicated account manager

    Volume licensing (multi-office, multi-region, flexible seat structures)

    Custom onboarding for large teams

    Priority SLA and direct support channel

Pricing

Spend less on oversight than a single billable hour.

All plans billed annually · 30-day guided trial on every plan · ZestineTech handles your onboarding

What you can't see today, becomes rework tomorrow.

See where Ze'Manage stops problems before they cost your project a week. From signup to live project in six steps, ZestineTech configures your account, onboards your team, and checks in four times during your 30 days.

Cloud Image
Cloud Image
Cloud Image
Cloud Image

Guided onboarding support.

Works with ACC & BIM 360.

Customized project report available.

Revit 2022–2027.

Cloud Image
Cloud Image

Explore More Product

Questions?
We're here to assist!

1. What is Ze'Manage and how does it prevent Revit model failure?

Ze'Manage is a BIM Execution Intelligence Platform for Autodesk Revit teams. Unlike traditional tools that merely audit model health after errors occur, Ze'Manage provides preventive governance inside Revit and real-time analytics on a web dashboard.

Icon

2. Does Ze'Manage work with Autodesk Construction Cloud (ACC) and BIM 360?

Icon

3. What is the difference between the Revit In-App Plugin and the Web App Dashboard?

Icon

4. What role does Ze AI play in BIM model management?

Icon

5.How does Ze'Manage deliver a return on investment (ROI) for our firm?

Icon

6.How long does it take to deploy Ze'Manage across an active project team?

Icon

Ze

Manage

Smart BIM
Implementation and Management

Ze'Manage turns your BIM data into early warnings, so your team catches model risk before it compounds, not after it costs you a week. Preventive intelligence built into Revit, with a live web dashboard, project analytics and exportable reports for every level of your organization.

Ze

Manage

Looks manageable.

Moved element12
Broken links4
Unsynced models3
Oversized family files7

Where BIM projects quietly lose time

PROJECTSUBMISSIONS
Inside the modelstill cheap to fix
In coordinationgetting expensive
On sitefull price

Inside the modelstill cheap to fix

0+

warnings silently piling up in a typical mid-project Revit model as you read this.

Revit performance research, 2025
0 hrs

every week your BIM managers spend fighting model issues, not designing.

AEC coordinator workload studies, 2025

In coordinationgetting expensive

0%

of your coordination conflicts, the most expensive ones to fix on site.

Optimar / Scientific Reports, 2026
2 - 4 wks

typical schedule slip on a mid-size project from late-stage Revit rework.

Construction Industry Institute (CII)

On sitefull price

$0

average cost when a single MEP issue is found on site instead of in the model.

MEP BIM industry analysis, 2025
0%

of project cost lost to rework when coordination issues escape the model.

ACS / industry estimates, 2025
1,000+

warnings silently piling up in a typical mid-project Revit model as you read this.

Revit performance research, 2025
Inside the modelstill cheap to fix
27 hrs

every week your BIM managers spend fighting model issues, not designing.

AEC coordinator workload studies, 2025
60%

of your coordination conflicts, the most expensive ones to fix on site.

Optimar / Scientific Reports, 2026
In coordinationgetting expensive
2 - 4 wks

typical schedule slip on a mid-size project from late-stage Revit rework.

Construction Industry Institute (CII)
$25,000

average cost when a single MEP issue is found on site instead of in the model.

MEP BIM industry analysis, 2025
On sitefull price
30%

of project cost lost to rework when coordination issues escape the model.

ACS / industry estimates, 2025

Understanding the root causes and resolving by precautionary actions.

Why Ze'Manage

Preventive Intelligence for BIM teams.

A workflow platform that turns project data into early warnings. so BIM Managers and Project

Directors design preventively. Not reactively.

Issue caught early
See risk before it costs you

Live analytics across every project - model health, version drift, user activity - so coordination issues surface at design stage, not a handover.

Govern before drift becomes damage

Pin protection, command rules, and OTP gates stop the silent edits that turn into rework. Prevention happens automatically, inside Revit.

GOVERNED AUTOMATICALLY
Pin protection
Command rules
OTP gate
Inside Revit — no manual review needed
Roles stay defined
Director
BIM Manager
Workspace
Structure your team before chaos sets in

Three-tier roles and project workspaces give Project Directors clear ownership and BIM Managers clean handoffs - before delivery pressure rewrites who does what.

One Platform
Built for your Engineering Teams
01
Digital Engineering Lead / Director
Risk visible before it slips the schedule.
02
BIM / VDC Manager
Catch drift before it costs you.
03
BIM Modeler / Engineer
Less guessing. More context.
Portfolio Health & BEP Compliance
Full Audit Trail
Digital Engineering Lead / Director
Portfolio Health & BEP Compliance
Predictable delivery and margins, every project against your BIM Execution Plan
Full Audit Trail
Governance that actually runs, full record when stakeholders ask why
Leadership & Client Reports
Customized reports for leadership, audits & client handover, generated in one click
01
02
03
04
05
06

Sync Control

Automatically syncs models in the background, intelligently queues concurrent syncs, and records every sync event with a complete audit trail.

Auto SyncSync QueueFull sync audit trail

Ze'Manage ROI

Find out what poor BIM governance is costing you.

Two settings and you'll see the number. Most teams have never counted it — which is exactly why it keeps happening.

1

Tell us about your team

12people
$65per hour
12months
2

What it has already cost you

In the last 12 months, your team has lost

$39,000

to sync waits, manual model checks and late-stage rework — work you paid for that produced nothing.

That is 0.3 full-time modellers you already pay for who produce nothing.

What those months cost you$39,000
What Ze'Manage would have cost for the same months$2,880

You have already lost 14× what it would have cost to prevent it.

3

Where those hours actually go

Waiting on syncs22 hrs
Manual model checks11 hrs
Late-stage rework17 hrs
Every month50 hrs
4

What changes with Ze'Manage

Back in your pocket, monthly

$2,100

Over a year

$25,200

Pays for itself in

3 days

Ze'Manage costs $240 a month for your 12 people, and recovers about 72% of the waste above.

$0.00has gone while you've had this page open. about $20 every working hour your team models.
Show me how Ze'Manage stops this

Based on industry Revit team baselines and BIM governance benchmarks. Licence modelled at $20/user/month, recovery at 72% of identified waste. Estimates, not a quotation.

Two Interfaces.
One Platform.

Your team works inside Revit. You manage from the web. Every module your modelers touch reports to your dashboard the instant it happens - one connected platform, from the model to the boardroom.

01Inside RevitFor Modelers & BIM Managers
Revit logoAutodesk Revit — Ze'Manage tabAdd-in
Syncing
Protection
4 tools
Syncing
Activity Tracker
3 tools
Syncing
Health Monitor
2 tools
Syncing
Sync Control
2 tools
Syncing
Manage Projects
3 tools
Syncing
Add-ons & Ze AI
3 tools
02On the WebFor Managers & Directors
Zemanage.com/dashboardLive
Total Work
495hrs
Sync Time
15h 43m
Protected
3
Work Hours Trend
Recent Activity
Sync completed
MEC-MOD-2025 · 1w
Session opened
GF_S_028 · 1w
Ze'Manage · syncing live
RevitWeb
Command blocked
Protection · CAD import logged → Protected +1
now

Connect to Content

Add layers or components to swipe between.

Pricing

Spend less on oversight than a single billable hour.

All plans billed annually · 30-day guided trial on every plan · ZestineTech handles your onboarding

What you can't see today, becomes rework tomorrow.

See where Ze'Manage stops problems before they cost your project a week. From signup to live project in six steps, ZestineTech configures your account, onboards your team, and checks in four times during your 30 days.

Guided onboarding support

Works with ACC & BIM 360

Customized project report available

Revit

2022–2027

Questions?
We're here to assist!

1. What is Ze'Manage and how does it prevent Revit model failure?

Ze'Manage is a BIM Execution Intelligence Platform for Autodesk Revit teams. Unlike traditional tools that merely audit model health after errors occur, Ze'Manage provides preventive governance inside Revit and real-time analytics on a web dashboard.

Icon

2. Does Ze'Manage work with Autodesk Construction Cloud (ACC) and BIM 360?

Icon

3. What is the difference between the Revit In-App Plugin and the Web App Dashboard?

Icon

4. What role does Ze AI play in BIM model management?

Icon

5.How does Ze'Manage deliver a return on investment (ROI) for our firm?

Icon

6.How long does it take to deploy Ze'Manage across an active project team?

Icon

Explore More Product

Looks manageable.

Moved element12
Broken links4
Unsynced models3
Oversized family files7

Where BIM projects quietly lose time

PROJECTSUBMISSIONS
Inside the modelstill cheap to fix
In coordinationgetting expensive
On sitefull price

Inside the modelstill cheap to fix

0+

warnings silently piling up in a typical mid-project Revit model as you read this.

Revit performance research, 2025
0 hrs

every week your BIM managers spend fighting model issues, not designing.

AEC coordinator workload studies, 2025

In coordinationgetting expensive

0%

of your coordination conflicts, the most expensive ones to fix on site.

Optimar / Scientific Reports, 2026
2 - 4 wks

typical schedule slip on a mid-size project from late-stage Revit rework.

Construction Industry Institute (CII)

On sitefull price

$0

average cost when a single MEP issue is found on site instead of in the model.

MEP BIM industry analysis, 2025
0%

of project cost lost to rework when coordination issues escape the model.

ACS / industry estimates, 2025
1,000+

warnings silently piling up in a typical mid-project Revit model as you read this.

Revit performance research, 2025
Inside the modelstill cheap to fix
27 hrs

every week your BIM managers spend fighting model issues, not designing.

AEC coordinator workload studies, 2025
60%

of your coordination conflicts, the most expensive ones to fix on site.

Optimar / Scientific Reports, 2026
In coordinationgetting expensive
2 - 4 wks

typical schedule slip on a mid-size project from late-stage Revit rework.

Construction Industry Institute (CII)
$25,000

average cost when a single MEP issue is found on site instead of in the model.

MEP BIM industry analysis, 2025
On sitefull price
30%

of project cost lost to rework when coordination issues escape the model.

ACS / industry estimates, 2025

Understanding the root causes and resolving by precautionary actions.

Why Ze'Manage

Preventive Intelligence for BIM teams.

A workflow platform that turns project data into early warnings. so BIM Managers and Project

Directors design preventively. Not reactively.

Issue caught early
See risk before it costs you

Live analytics across every project - model health, version drift, user activity - so coordination issues surface at design stage, not a handover.

Govern before drift becomes damage

Pin protection, command rules, and OTP gates stop the silent edits that turn into rework. Prevention happens automatically, inside Revit.

GOVERNED AUTOMATICALLY
Pin protection
Command rules
OTP gate
Inside Revit — no manual review needed
Roles stay defined
Director
BIM Manager
Workspace
Structure your team before chaos sets in

Three-tier roles and project workspaces give Project Directors clear ownership and BIM Managers clean handoffs - before delivery pressure rewrites who does what.

Why Ze'Manage

Preventive Intelligence for BIM teams.

A workflow platform that turns project data into early warnings. so BIM Managers and ProjectDirectors design preventively. Not reactively.

See risk before it costs you

Issue caught early

Live analytics across every project - model health, version drift, user activity - so coordination issues surface at design stage, not a handover.

Govern before drift becomes damage

GOVERNED AUTOMATICALLY
Pin protection
Command rules
OTP gate
Inside Revit — no manual review needed

Pin protection, command rules, and OTP gates stop the silent edits that turn into rework. Prevention happens automatically, inside Revit.

Structure your team before chaos sets in

Roles stay defined
Director
BIM Manager
Workspace

Three-tier roles and project workspaces give Project Directors clear ownership and BIM Managers clean handoffs - before delivery pressure rewrites who does what.

One Platform
Built for your Engineering Teams
01
Digital Engineering Lead / Director
Risk visible before it slips the schedule.
02
BIM / VDC Manager
Catch drift before it costs you.
03
BIM Modeler / Engineer
Less guessing. More context.
Portfolio Health & BEP Compliance
Full Audit Trail
Digital Engineering Lead / Director
Portfolio Health & BEP Compliance
Predictable delivery and margins, every project against your BIM Execution Plan
Full Audit Trail
Governance that actually runs, full record when stakeholders ask why
Leadership & Client Reports
Customized reports for leadership, audits & client handover, generated in one click

Sync Control

Automatically syncs models in the background, intelligently queues concurrent syncs, and records every sync event with a complete audit trail.

Auto Sync

Sync Queue

Full sync audit trail

01

/06

Icon
Icon

01

02

03

04

05

06

01
02
03
04
05
06

Sync Control

Automatically syncs models in the background, intelligently queues concurrent syncs, and records every sync event with a complete audit trail.

Auto SyncSync QueueFull sync audit trail

Ze'Manage ROI

Find out what poor BIM governance is costing you.

Two settings and you'll see the number. Most teams have never counted it — which is exactly why it keeps happening.

1

Tell us about your team

12people
$65per hour
12months
2

What it has already cost you

In the last 12 months, your team has lost

$39,000

to sync waits, manual model checks and late-stage rework — work you paid for that produced nothing.

That is 0.3 full-time modellers you already pay for who produce nothing.

What those months cost you$39,000
What Ze'Manage would have cost for the same months$2,880

You have already lost 14× what it would have cost to prevent it.

3

Where those hours actually go

Waiting on syncs22 hrs
Manual model checks11 hrs
Late-stage rework17 hrs
Every month50 hrs
4

What changes with Ze'Manage

Back in your pocket, monthly

$2,100

Over a year

$25,200

Pays for itself in

3 days

Ze'Manage costs $240 a month for your 12 people, and recovers about 72% of the waste above.

$0.00has gone while you've had this page open. about $20 every working hour your team models.
Show me how Ze'Manage stops this

Based on industry Revit team baselines and BIM governance benchmarks. Licence modelled at $20/user/month, recovery at 72% of identified waste. Estimates, not a quotation.

Two Interfaces.
One Platform.

Your team works inside Revit. You manage from the web. Every module your modelers touch reports to your dashboard the instant it happens - one connected platform, from the model to the boardroom.

01Inside RevitFor Modelers & BIM Managers
Revit logoAutodesk Revit — Ze'Manage tabAdd-in
Syncing
Protection
4 tools
Syncing
Activity Tracker
3 tools
Syncing
Health Monitor
2 tools
Syncing
Sync Control
2 tools
Syncing
Manage Projects
3 tools
Syncing
Add-ons & Ze AI
3 tools
02On the WebFor Managers & Directors
Zemanage.com/dashboardLive
Total Work
495hrs
Sync Time
15h 43m
Protected
3
Work Hours Trend
Recent Activity
Sync completed
MEC-MOD-2025 · 1w
Session opened
GF_S_028 · 1w
Ze'Manage · syncing live
RevitWeb
Command blocked
Protection · CAD import logged → Protected +1
now

Pricing

Spend less time on coordination.
More time on delivery.

All plans billed annually · 30‑day guided free trial on every plan · ZestineTech handles your onboarding

Standard

$18

/user/month

$15

Billed annually ·

Min. 10 users

For BIM teams who need accountability, protection, and AI assistance built into Revit.

Activity Tracker & Session Logs

Governance & Protection (Pin + Command + Event)

OTP Approval with screenshot evidence

Role-based access (Company Admin, Project Admin, User)

Ze AI — model-aware assistant

Add-ons (Batch NWC Export + Link Remapper)

4 guided onboarding sessions during trial

What’s Included

Most Recommended

Pro

$25

/user/month

$20

Billed annually ·

Min. 10 users

For BIM Coordinators and VDC teams who need full model visibility — health monitoring, sync control, and everything in Standard.

Everything in Standard

Health Monitor - 30+ metrics, live dashboard, email alerts

Sync Control — Auto Sync (no lost work from missed syncs) + Sync Queue (no waiting when two users hit sync at once)

4 guided onboarding sessions during trial

4 email marketing campaigns per month

Social media account management (20 posts per month)

Search Engine Optimization (SEO) services

What’s Included

Most Recommended

Enterprise

Billed annually ·

Min. 100 users

For large AEC firms and multi-project portfolios that need dedicated support, custom licensing, and firm-wide deployment.

Custom

What's Included
Everything in Standard + Pro
Dedicated account manager
Volume licensing (multi-office, multi-region, flexible seat structures)
Custom onboarding for large teams
Priority SLA and direct support channel

What you can’t see today, becomes rework tomorrow.

See where Ze’Manage stops problems before they cost your project a week. From signup to live project in six steps, ZestineTech configures your account, onboards your team, and checks in four times during your 30 days.

Cloud Image
Cloud Image
Cloud Image
Cloud Image

Guided onboarding support.

Works with ACC & BIM 360.

Customized project report available.

Revit 2022–2027.

Cloud Image
Cloud Image

Explore More Product

Questions?
We're here to assist!

1. What is Ze'Manage and how does it prevent Revit model failure?

Ze'Manage is a BIM Execution Intelligence Platform for Autodesk Revit teams. Unlike traditional tools that merely audit model health after errors occur, Ze'Manage provides preventive governance inside Revit and real-time analytics on a web dashboard.

Icon

2. Does Ze'Manage work with Autodesk Construction Cloud (ACC) and BIM 360?

Icon

3. What is the difference between the Revit In-App Plugin and the Web App Dashboard?

Icon

4. What role does Ze AI play in BIM model management?

Icon

5.How does Ze'Manage deliver a return on investment (ROI) for our firm?

Icon

6.How long does it take to deploy Ze'Manage across an active project team?

Icon

Ze

Manage

Smart BIM
Implementation and Management

Ze’Manage turns your BIM data into early warnings, so your team catches model risk before it compounds, not after it costs you a week. Preventive intelligence built into Revit, with a live web dashboard, project analytics and exportable reports for every level of your organization.

Ze

Manage